Configuration with CorePlus gas connect consoles

The image shows the connections between the cutting system components.
1 Work cables
2 Computer Numerical Control (CNC) connection cable (EtherCAT® shown)
3 Controller Area Network (CAN) cable
4 Power cable, 120 VAC
5 Coolant-supply hose and coolant-return hose
6 Pilot-arc cable
7 Negative cables
8 Pilot-arc and coolant assembly
8a Pilot-arc cable
8b Coolant-supply hose and coolant-return hose
9 Power, CAN, 4-gas assembly
9c Power cable, 120 VAC
9d CAN cable
9e Four gas hoses (CorePlus)
10 Torch lead
11 Hoses for supply gases
12 Power cable, 220 VAC
*

Regulators

Note:

Put a gas regulator 3 meters (10 feet) or less from the gas connect console, or adjust inlet gas pressures to be in the specified process gas tolerances.