Pilot Arc state (9)

During the Pilot Arc state (9), the system does a check for correct coolant flow, gas pressures, temperatures, Direct Current (DC) bus voltage, chopper current, and work cable current. The Pilot Arc state (9) must be completed in 500 milliseconds or less.

The image shows a flowchart of the process for the Pilot Arc state (9).
  • If the Pilot Arc state (9) completes correctly, the process continues with Ramp-up state (11).
  • If one or more of these measurements is not correct, the process continues with End of Cycle state (14):
    • Coolant flow
    • Gas pressure
    • Temperature
    • DC bus voltage
    • Chopper current
    • Work cable current
  • If the Pilot Arc state (9) does not complete in 500 milliseconds, continue troubleshooting steps to identify the problem.

Refer to Initial inspection steps for troubleshooting procedures.