Power-up state (1)
The Power-up state (1) process starts when the operator sets the remote on-off switch for the plasma cutting system to the ON position and the redundant remote on-switch (if enabled) to the ON position.
If the Power-up state (1) completes correctly, the process continues with Initial Checks state (2).
Refer to Initial inspection steps for troubleshooting procedures.
