Initial Checks state (2)

During the Initial Checks state (2), the system looks for diagnostic codes and gets temperature and inlet pressure measurements.

The image shows a flowchart of the process for the Initial Checks state (2).

If the Initial Checks state (2) completes correctly, the process continues with Gas Purge/Pump On state (3).

Refer to Initial inspection steps for troubleshooting procedures.