Use this information to install the different system components.
This checklist summarizes major installation steps. You can use it to record their completion. For full information, refer to auc1699974626495.html.
System components that are correctly grounded can protect operators and equipment from dangerous voltages. Ground the system components after they are in position, and before you connect the hoses, cables, and leads.
Before you install the hoses, cables, and leads, uncoil and examine them.
Use this information to connect the hoses, cables, and leads to the plasma power supply.
Use this information to connect the hoses, cables, and leads to the gas connect console.
Use this information to connect the Core™ or CorePlus™ gas connect console.
These installation steps are for the VWI™ or OptiMix™ gas connect console.
Comply with all safety requirements when you install and connect the supply gases for the plasma cutting system. For example, use flashback arrestors, release gases with an exhaust system, and tighten hoses as specified for different hose dimensions.
Use this information to install the torch-lead assembly to the torch receptacle. For easier installation, make sure that the connections are done in the same sequence as these steps.
Make sure to use the correct lead lengths for the best cut quality and longest consumable life.
It can be necessary to remove the torch and consumable parts for replacement, maintenance, or troubleshooting.
Make sure that the torch is correctly installed in the torch receptacle.
Install the torch in the torch mounting bracket. Make sure it is level in all directions, then tighten the screws on the bracket.
Make sure that the consumables are installed correctly on the torch.
Connect the main power cord to the plasma power supply. Make sure that the line-disconnect switch is in the OFF position. Use the applicable color codes for the main power cord wires.